Price Beat Guarantee: we’ll beat any quote by $1/m²* Flooring samples delivered to your door — order online 4 showrooms across Sydney & Brisbane — find your nearest
Spring SaleExtra 5% Off Everything. Use code SPRINGSALE. Ends 30th September.

Flooring Installation Cost

Free tool · no obligation

What will it cost to install your floor?

Most quotes only show a single number. This estimator breaks installation down the way an installer actually prices it — labour, subfloor prep, removing the old floor, trims and stairs — so you can see where the money goes before anyone visits.

✓Labour costs only ✓Itemised, not a single number ✓No details required
Hybrid plank
Free
Measure & quote
Fixed
Written price before we start
2016
Family owned since
4
Showrooms SYD & BNE
The floorplan reader needs the proxy plugin installed. This page checks for window.TFG_FP and routes through /wp-json/tfg/v1/floorplan when it’s there, falling back to a direct API call for preview only. Install tfg-floorplan-proxy.php and put the key in wp-config.php before publishing — without it the reader won’t work on the live site, and an API key in front-end code is a key anyone can take.

This page prices labour, not materials. Confirm before publishing whether that split matches how TFG actually quotes — if installation is normally bundled with supply, the wording here and in the estimator needs to say so, and the rate card needs to include the material component. Laying rates for hybrid, engineered timber, vinyl plank, carpet and carpet tile are set. Laminate, bamboo and both glue-down rates are still assumptions.

Before you compare quotes

Four things that move an installation price

Two quotes for the same floor can be $2,000 apart and both be honest. Almost always, it comes down to these.

01

How it’s fixed down

Floating over underlay is the quickest. Glue-down and direct-stick take longer, need more prep and cost noticeably more per m² — but they’re required for some products and some subfloors.

02

What’s already on the floor

Pulling up carpet is easy. Lifting glued vinyl or tiles is slow, dusty work, and the waste has to go somewhere. This line alone can swing a quote by thousands.

03

How flat the slab is

Manufacturers specify a tolerance, usually around 3mm over 2m. If the slab is outside it, the floor will move or creak. Levelling compound is cheap; ignoring it isn’t.

04

The finishing details

Skirting, scotia, door bars, undercutting doors, stairs. Small items individually, but they’re the most common thing missing from a cheap quote.

Instant estimate

Estimate your installation cost

Measure roughly and round up. You’ll get an indicative range for labour, based on a straightforward job with reasonable access.

1. Rooms

Leave width blank to enter m² directly
Read the areas off my floorplan AI
Your floorplan
—

Your plan is sent to Anthropic’s Claude to read the room names and dimensions, and isn’t stored. Nothing is sent to us until you submit the enquiry.

Reading…

Check these before using them

Untick anything you’re not flooring, and correct any number that looks wrong.

RoomWidth mLength mArea m²
Total selected0.0 m²

Claude reads the dimensions printed on the plan. Where a room has no printed size it estimates from the drawing and flags it — those are the ones worth checking. Treat the result as a good working number, not a survey; the fixed price comes from the on-site measure.

2. Flooring type

The swatches are drawings, not product photos — they show the layout, not the colour or grain. Colour is chosen from physical samples at the measure.

3. How it goes down

4. Finishing & extras

Estimator controls

Staff view only
Rate card — staff view
——
Indicative installation cost, inc GST
$0
Add a room to start
— per m² — days on site
Book a free measure & quote

Labour and installation materials only — the flooring itself is priced separately. Indicative, not a fixed-price offer. Assumes a sound subfloor, reasonable access and no asbestos-containing material. Your fixed price is confirmed in writing after a free on-site measure.

Cost guide

Typical installation rates in Australia

Labour only, per square metre, for a straightforward residential job. Useful for sanity-checking a quote you’ve already been given.

Flooring typeTypical install rateMethodSpeed
These figures come from the rate card, so they update when the rate card does. Hybrid, engineered timber, vinyl plank, carpet and carpet tile now use TFG’s own rates. Four are still assumptions and need setting: laminate, bamboo, engineered glue-down and vinyl glue-down. Change them in the staff panel (?admin=1), then write the values into DEFAULTS so customers see them too.

No surprises

What an installation quote should cover

Included in our installation

  • ✓Moisture testing the slab before we start
  • ✓Laying to the manufacturer’s specification, so the warranty holds
  • ✓Expansion gaps at every wall, column and fixed cabinet
  • ✓Cutting in around doorways, hearths and joinery
  • ✓Removing offcuts and packaging from site
  • ✓A walk-through with you before we leave

Quoted separately — always ask

  • !The flooring itself, and delivery of it
  • !Levelling compound if the subfloor is out of tolerance
  • !Removing and disposing of the existing floor
  • !Asbestos testing or removal — licensed trades only
  • !Painting or replacing skirting after the floor goes down
  • !Electrical work for under-floor heating

Good to know

Installation FAQs

Why is one quote so much cheaper than another?
Usually because something has been left out. The three items most often missing are removal and disposal of the old floor, subfloor levelling, and the finishing trims. Ask every quote to itemise those three and the gap normally closes.
Can you lay over my existing tiles?
Often yes, for a floating floor, provided the tiles are sound, well bonded and flat enough. It saves the cost of removal and the mess. It does raise the floor height, which affects doors and thresholds. We check this at the measure.
Do I need acoustic underlay?
If you’re in an apartment, almost certainly — most strata by-laws set a minimum rating and you can be ordered to pull the floor up if it doesn’t comply. In a house it’s optional, but it improves comfort underfoot and most manufacturers require some underlay for the warranty on a floating floor.
How long will it take?
A typical three-bedroom home with a floating floor is one to two days for the laying. Add a day if the old floor has to come up, and a day if levelling is needed, since the compound has to cure before anything can go over it.
What if there’s asbestos under my old vinyl?
Stop, and don’t let anyone break it up. Vinyl and its backing from before the 1990s can contain asbestos. It needs testing, and removal by a licensed asbestos remover — not a flooring installer. We’ll flag it at the measure if we see something suspect.
Is the estimate what I’ll actually pay?
It’s close for a straightforward job. What moves it: a subfloor needing more levelling than expected, difficult access, unusual room shapes with a lot of cutting, and anything discovered once the old floor comes up. All of it gets quoted in writing before work starts.

Next step

Turn the estimate into a fixed price

An estimator can’t see your subfloor. A measure can. We come out, check the levels, test for moisture, look at access, and give you one fixed written price. No obligation, no deposit. Prefer to talk? Call 1300 477 699, 7 days.

Bring your other quotes

If you’ve been quoted elsewhere, send it through. We’ll tell you honestly whether it’s a good price, and where our Price Beat Guarantee applies.*

Request a free measure & quote

Takes 30 seconds · we reply within one business day

We use your details to quote this job and nothing else.

Price Beat Guarantee

We’ll beat any written quote by $1/m²*

4 Showrooms

Sydney & Brisbane

Samples To Your Door

See and feel the quality before you buy

Family Owned Since 2016

Honest advice from flooring specialists

Staff view