Floor Prep for Hybrid Flooring

Proper floor preparation is essential for a successful installation of hybrid flooring. Here are some steps to follow for preparing the floor:

  1. Clear the area: Remove all furniture, appliances, and other items from the room where the hybrid flooring will be installed.
  2. Remove the existing flooring: If there is existing flooring, remove it to expose the subfloor. This could include carpet, hardwood, tile, or any other type of flooring. If the existing flooring is glued down, you may need to use a scraper or chemical remover to lift it off.
  3. Check the subfloor: Inspect the subfloor for any damage, such as cracks or holes. If there are any areas that need to be repaired, use a suitable patching compound to fill them in.
  4. Level the subfloor: Use a self-leveling compound to even out any low spots or high spots on the subfloor. Follow the manufacturer’s instructions for application and drying time.
  5. Clean the subfloor: Sweep or vacuum the subfloor to remove any dust or debris. If necessary, use a damp mop or cloth to clean the surface.

Proper floor preparation is crucial to the success of your hybrid flooring installation. Be sure to carefully follow the manufacturer’s instructions and consult with a professional installer or manufacturer if you have any questions or concerns.

Leave a comment

Your email address will not be published. Required fields are marked *

0
YOUR CART
  • No products in the cart.