Price Beat Guarantee: we’ll beat any quote by $1/m²* Flooring samples delivered to your door — order online 4 showrooms across Sydney & Brisbane — find your nearest
Spring SaleExtra 5% Off Everything. Use code SPRINGSALE. Ends 30th September.

Floor Prep for Hybrid Flooring: A Practical Guide

Aqua Stone 8.5 Dune hybrid flooring scene with light oak planks

Australian flooring guide · Reviewed 2026

Floor Prep for Hybrid Flooring: A Practical Guide

Hybrid flooring is forgiving once it's down, but it's unforgiving about what it's laid on.

The Flooring GuysEvidence-aware buyer advice
Floor Prep for Hybrid Flooring: A Practical Guide
Hybrid flooring guide

Hybrid flooring is forgiving once it’s down, but it’s unforgiving about what it’s laid on. A click-lock SPC or RCB plank floats over the subfloor, which means every dip, hump, nail head and damp patch underneath will eventually telegraph through — as a creak, a popped joint, or a plank that flexes underfoot. The good news: prep is mostly common sense. This guide walks through the stages we use on real installs across our Sydney and Brisbane jobs.

Aqua Stone 8.5 Dune hybrid flooring installed in a prepped open-plan living area
Aqua Stone 8.5 in Dune — a properly prepped subfloor is what lets a hybrid floor sit flat for years.

1. Clear the room properly

Take everything out — furniture, appliances, rugs, doormats. Pull off skirting if you want a finish-trimmed look at the perimeter (most installers prefer this to using scotia). Take doors off their hinges so you can plane the bottoms once you know your final floor height. Hybrid plus underlay typically sits 7-9 mm above the existing subfloor, so doors almost always need a few millimetres trimmed.

2. Remove the existing floor

Whether you can lay over the top depends on what’s there. Carpet and underlay always come up. Floating laminate usually comes up. Tiles can stay if they’re sound, level and not drummy — but you’ll need to scarify the surface so the new floor sits flat. Glued-down vinyl or cork generally has to come off; a long-handled scraper or a heat gun does most of the work, and a chemical adhesive remover handles the residue.

If you’re laying onto a concrete slab — common in Australian ground-floor builds and apartments — the slab itself becomes your subfloor. We’ve covered the slab-specific considerations in detail in our guide to laying vinyl on a concrete floor, and the same principles apply to hybrid.

3. Inspect the subfloor and check moisture

Walk every square metre. You’re looking for cracks, holes, soft spots, loose boards, protruding fasteners, and any sign of damp. On timber subfloors, drive any proud nail heads or screws below the surface. On concrete, mark cracks wider than a hairline — they’ll need filling.

Moisture is the one most DIYers skip. Hybrid is waterproof on the wear side, but a slab releasing moisture from below can still cause issues with the underlay and the click joints. A simple plastic-sheet test (tape a 1 m square of plastic to the slab overnight; condensation underneath means the slab is still releasing moisture) is the bare minimum. For new slabs, give it the manufacturer’s recommended cure time before laying anything.

4. Patch and repair

Fill cracks and holes with a flexible patching compound rated for the substrate. On timber subfloors, replace any rotted or water-damaged sections rather than patching over them — a soft spot under a click floor will eventually become a squeak. Re-fix loose boards with screws (not nails) so they don’t work loose again under foot traffic.

5. Level the subfloor

This is the step that decides how your floor performs in five years. Hybrid manufacturers typically specify a tolerance of 3 mm over a 2 m straightedge. Anything outside that and you’ll get visible undulation and stressed joints. Use a long spirit level or a 2 m timber straightedge, mark the high and low spots, and treat them in the right order:

  • High spots on concrete: grind down with a concrete grinder or diamond cup wheel.
  • Low spots on concrete: fill with self-levelling compound, mixed and poured per the manufacturer’s spec.
  • High spots on timber: sand or plane down.
  • Low spots on timber: shim with packers or use a timber-rated levelling compound.

Self-levelling compound has to cure fully before you lay anything on top — usually 24 hours, longer in cold weather. Don’t shortcut this; trapping moisture under hybrid is a slow-burn problem.

Aqua Stone 8.5 Brighton hybrid flooring plank close-up
Aqua Stone 8.5 in Brighton — a click-lock SPC plank only performs as well as the subfloor under it.

6. Clean and acclimatise

Vacuum the entire floor — a broom alone leaves grit that will sit between underlay and subfloor and feel rough underfoot for the life of the floor. Wipe up any patching dust with a damp cloth and let it dry completely.

Then bring the boxes of hybrid into the room and leave them flat for at least 48 hours before installing. Hybrid is more dimensionally stable than laminate, but it still benefits from settling to the room’s temperature and humidity. Don’t stack the boxes on edge or lean them against a wall — the planks need to lie flat.

7. Plan the layout before you lay the first plank

Measure the room and dry-lay the first row to check that you won’t end up with a sliver-width plank against the far wall. Square the room with the 3-4-5 rule rather than trusting that the walls are parallel — they almost never are in older Australian homes. Leave the manufacturer-specified expansion gap around the perimeter and around any fixed object (kitchen islands, columns, hearths). Our expansion gap guide covers why this matters and what happens when it’s skipped.

When to call an installer

If your slab needs more than a thin skim of self-leveller, if there’s any sign of rising damp, or if you’re laying over a heated subfloor, get a professional installer to handle prep. The cost of a properly prepped subfloor is small compared to lifting a floor 18 months in because it was laid over an undulating slab.

If you’re still choosing your floor, the hybrid flooring brands guide covers the ranges we stock and which one suits which room. We’re happy to walk you through prep specifics in any of our showrooms before you commit.

Frequently asked questions

What is the most important step in floor prep for hybrid?

Getting the subfloor flat and dry. Hybrid is forgiving once it is down but unforgiving about what it is laid on, and most failures trace back to the surface underneath.

Do I need to test the subfloor for moisture?

Yes on a concrete slab, and most manufacturers require a documented test for the warranty to apply. Timber subfloors are checked with a pin meter.

How long should hybrid planks acclimatise?

At least 48 hours in the room they will be laid in, stacked flat at normal living temperature. Longer in humid conditions.

Sources and verification

Compare the complete floor, not one headline number.

Bring your room dimensions, subfloor details and any strata requirement. We can help shortlist compatible products and prepare an itemised flooring quote.

Ready to see the floors for yourself?

Order samples delivered to your door, or talk to a flooring specialist — 7 days a week.

Shop flooring Get a free quote

← All articles